Harrisonburg, VA, September 30, 2026 — A public meeting convened in Rockingham County, Virginia, to present proposed renovation plans for the Lake Shenandoah Dam. Representatives from the Virginia Department of Wildlife Resources (DWR) outlined the project, which centers on replacing the existing structure built in 1956.

The DWR’s proposal includes the demolition of the current dam. A new dam is slated to be constructed approximately 150 feet upstream from the existing site. Specific details regarding the construction methods for the new dam and the demolition process were presented to attendees.

During the meeting, local residents had the opportunity to share their perspectives on the planned renovations. Some community members voiced concerns, particularly regarding the potential impact of the project on existing wildlife habitats in the vicinity of the dam. The specific nature of these habitat concerns was shared by residents during the public comment period.

The renovation project is projected to have a duration of 12 months. The Virginia Department of Wildlife Resources anticipates that the work will be completed by the end of 2027. Further details regarding timelines for specific phases of demolition and construction were discussed. Information about potential permits or inspection outcomes was not explicitly detailed in the presented plans.


Story summarized from the original created by BriAsia Kelley on www.whsv.com, see more information here.

Media gallery

About The Author